vol.1 REINFORCEMENT OF A CONTAINMENT WALL
 

REINFORCEMENT OF A CONTAINMENT WALL

The NIHON KASETSU NWC-60 model used to treat the wastewater from the containment wall reinforcement works.
In this project, a pile driving machine drilled holes along a 30 metre slope and reinforced it with rebar and concrete. The water was used to cool the drill, and was flowing at certain points along the slope. A total of 500 tons of wastewater was purified in this project.
The wastewater generated went through 3 stages before entering the equipment. The first phase was a collection tank for the water, before passing through a pipe to a second tank. It was then stored in a tank at a level above the NWC-60 equipment.
After being treated, the clean water was run off into a nearby river and the sludge stored in another tank for subsequent transport to a landfill site.
 
 
             
 
 
一次沈砂池
 
 
放水路
 
 
最終沈砂池
 
First collection tank Pipe conduit Second collection tank
 
原水槽とゼロシステム
 
ゼロシステム
 
ゼロシステムと操作盤
 
  Raw water tank and NWC-60 treatment equipment   NWC-60 equipment   NWC-60 equipment and sludge removal tubing  
 
ゼロシステムと汚泥層
 
汚泥層
     
  NWC-60 equipment and sludge tank   Sludge tank      
 
Wastewater treatment process
The level of the turbidity was 3000 NTU, giving a treatment capacity of 10m3/h.
 
 
 
濁水流入口
 
 
排水口
 
 
1次・2次沈降槽
Entry of raw water First and second tanks Treated water outlet
 
 
 
濁水処理状況(一次沈砂池⇒原水槽⇒処理水)
  The process: first water tank, raw water tank and treated water.